AEGIS PROJECT // STASIS CHAMBER 07

SIGNAL DETECTION & ANALYSIS SYSTEM

Navigation

THRESHOLD // JUMP CONSOLE · 1 JU = 1 PARSEC

Navigation Input

CH.01
units
units
units
units
JU
units
units
units/day

Solution Readout

CH.02
Total Jump Mass
0units
Jump Distance
1JU
TF-1 Required
0units
Current TF-1
0units
Fuel Remaining
0units
Water Component
0units (H₂O)
Metallic Hydrogen
0units (mH)
Refining Time
0
Jump Noise
1(Round Up)
Detection Radius
~ 1JU
Operational Summary

Spring's First Light has a total Jump Mass of 0 and is attempting a 1 JU jump. The vessel requires 0 units of TF-1. Its tanks currently contain 0 units, leaving 0 units in reserve after the jump. The jump generates Noise 1 using the Round Up campaign rule.

SYSTEM STATUS

NOMINAL

MODE

SCAN

FREQUENCY

0.5 – 120.0 HZ

GAIN

7.3 dB